The transformation of China Basin Park reflects a distinct shift in how San Francisco values its maritime boundaries. The transition from industrial storage to a mixed-use neighborhood centers entirely on the presence of this public realm.
| Metric | Historic Parking Lot A (2000, 2019) | China Basin Park & Phase 1 (Present) |
|---|---|---|
| Public Open Space | 0 acres (gated parking asphalt) | 5 contiguous waterfront acres |
| Shoreline Flood Elevation | Original grade (~8, 9 feet NAVD88) | Elevated fill pad (12, 14 feet NAVD88) |
| Residential Density | Zero housing units | 537 units across Verde (Parcel A) & Parcel F |
| Commercial Footprint | Surface vehicle storage | 550,000+ sq ft life science & office (Parcels B & G) |
| Pedestrian/Bike Access | Sidewalk dead-end at 3rd Street Bridge | Paved, continuous Bay Trail connection |